SPECIFICATION SHEET β’ SI METRIC
CAT: AUTO-MFG
Overall Equipment Effectiveness (OEE)
Calculate OEE from planned time, downtime, runtime, ideal cycle time, total count, and good count.
π‘ Engineering Knowledge PrimerOEE decomposes productive output into Availability, Performance, and Quality. It is a measurement KPI; it does not replace a loss tree, root-cause analysis, maintenance plan, or process-capability study.
OPERATING LIMITS β KPI calculation only; align product definitions, ideal-cycle standards, planned-stop rules, and loss classification before benchmarking.
INPUT DESIGN PARAMETERS (SI)
h/shift
h/shift
h/shift
s/unit
units/shift
units/shift
CALCULATED SPECIFICATION OUTPUT
Overall Equipment Effectiveness
77.78 %
| Availability | 93.33 % |
| Performance | 85.71 % |
| Quality | 97.22 % |
| KPI Assessment | Within KPI range Status |
Related planning checklists
This calculator appears in the following engineering planning checklists:
OEE, Takt Time & Production Capacity Assessment
Plant Operations Manager1. Takt Time & Required Production Rate2. Cycle Time & Production Capacity3. Overall Equipment Effectiveness (OEE)4. Equipment Availability & Utilization (KPI)
Technical Methodology & Engineering Principles
GOVERNING EQUATION
Planned Production Time = Scheduled Time β Planned Downtime
Availability = Run Time / Planned Production Time
Performance = Ideal Cycle Time Γ Total Count / Run Time
Quality = Good Count / Total Count
OEE = Availability Γ Performance Γ Quality
Assumptions & Scope
All time and count inputs refer to the same reporting period; ideal cycle time is the validated best demonstrated rate for the product and equipment.
Operating Range & Boundary
Planned downtime cannot exceed scheduled time; run time cannot exceed planned production time; good count cannot exceed total count.