SPECIFICATION SHEET β€’ SI METRIC
CAT: BULK-HANDLING

Haul Truck Cycle & Productivity

Determine hourly fleet haulage tonnage based on excavator bucket passes, haul distance, speed, and dump cycle time.

πŸ’‘ Engineering Knowledge PrimerHaul truck fleet productivity calculates hourly material transport rate based on truck payload, travel time, and fixed spot/dump times. Balancing excavator loading rate with truck haulage cycles minimizes fleet queueing delays.
OPERATING LIMITS β€” Fleet-productivity calculation only; include queues, grades, delays and utilisation in project planning.
INPUT DESIGN PARAMETERS (SI)
t
km
km/h
min
CALCULATED SPECIFICATION OUTPUT
Productivity per Truck
πŸ“¦
333.3 t/h
Total Cycle Time18 min

Technical Methodology & Engineering Principles

GOVERNING EQUATION
Travel Time = (Distance Γ— 2 / Speed) Γ— 60 Cycle Time = Travel Time + Spot & Dump Time Productivity = Payload Γ— (60 / Cycle Time)
Assumptions & Scope

100% operating efficiency factor without queueing delay.

Operating Range & Boundary

Use finite, physically meaningful inputs within the stated operating assumptions.