Engineering planning checklist
Commercial Dry Tonnage
Convert moist weights to dry billable tonnage and size screw conveyors.
Use as a checklist, not an automated design workflow. Complete and verify each calculation independently. Only explicit carry-forward links move a compatible value; all other inputs remain your responsibility.
What this workflow covers
Convert moist weights to dry billable tonnage and size screw conveyors.
This 3-step checklist is intended for logistics manager. Confirm each linked calculator's units, formula, assumptions and operating limits before using the result in a project decision.
Checklist progress0 of 3 steps checked
Sequence Execution
1
Moisture Content Converter (Wet vs Dry Basis)
Convert between wet-basis moisture percentage (Mw) and dry-basis moisture percentage (Md).
WORKFLOW INSTRUCTION:Confirm the published assumptions, enter the project data, and record the result and operating limits for Moisture Content Converter (Wet vs Dry Basis).
2
Wet-Tonnage to Dry-Tonnage Converter
Convert moist ore/concentrate wet weight to net dry weight based on moisture percentage.
WORKFLOW INSTRUCTION:Confirm the published assumptions, enter the project data, and record the result and operating limits for Wet-Tonnage to Dry-Tonnage Converter.
3
Screw Conveyor Capacity Calculator
Scope-limited calculation
Calculate screw conveyor volumetric and mass throughput based on screw diameter, pitch, RPM, and trough loading %.
WORKFLOW INSTRUCTION:Confirm the published assumptions, enter the project data, and record the result and operating limits for Screw Conveyor Capacity Calculator.
Target Persona
Logistics Manager
Typical End User