Engineering planning checklist

Open-Pit Mine Planning

Calculate RQD rock mass ratings, stripping ratios, and ore inventory volumes.

Use as a checklist, not an automated design workflow. Complete and verify each calculation independently. Only explicit carry-forward links move a compatible value; all other inputs remain your responsibility.

What this workflow covers

Calculate RQD rock mass ratings, stripping ratios, and ore inventory volumes.

This 3-step checklist is intended for mining engineer. Confirm each linked calculator's units, formula, assumptions and operating limits before using the result in a project decision.

Checklist progress0 of 3 steps checked
Sequence Execution
1

Rock Quality Designation (RQD) & RMR Index

Scope-limited calculation

Calculate Rock Quality Designation (RQD %) and estimated Rock Mass Rating (RMR) from drill core logs.

WORKFLOW INSTRUCTION:Confirm the published assumptions, enter the project data, and record the result and operating limits for Rock Quality Designation (RQD) & RMR Index.
2

Open-Pit Stripping Ratio Calculator

Calculate volumetric (m³/m³) and mass (t/t) stripping ratios for open-pit mine planning.

WORKFLOW INSTRUCTION:Confirm the published assumptions, enter the project data, and record the result and operating limits for Open-Pit Stripping Ratio Calculator.
3

Stockpile Volume & Tonnage Calculator

Scope-limited calculation

Calculate volume and ore tonnage of conical and kidney/elongated stockpiles based on angle of repose.

WORKFLOW INSTRUCTION:Confirm the published assumptions, enter the project data, and record the result and operating limits for Stockpile Volume & Tonnage Calculator.

Target Persona

Mining Engineer
Typical End User