Calculate factory ventilation requirements, chilled water cooling capacity, and cooling tower makeup water.
Use as a checklist, not an automated design workflow. Complete and verify each calculation independently. Only explicit carry-forward links move a compatible value; all other inputs remain your responsibility.
What this workflow covers
Calculate factory ventilation requirements, chilled water cooling capacity, and cooling tower makeup water.
This 3-step checklist is intended for hvac engineer. Confirm each linked calculator's units, formula, assumptions and operating limits before using the result in a project decision.
Checklist progress0 of 3 steps checked
Sequence Execution
1
Factory Air Exchange & Ventilation
Scope-limited calculation
Calculate required ventilation airflow (CFM or mΒ³/hr) based on building volume and required Air Changes per Hour (ACH).
WORKFLOW INSTRUCTION:Confirm the published assumptions, enter the project data, and record the result and operating limits for Factory Air Exchange & Ventilation.
2
Industrial Chilled Water Cooling Capacity (HVAC)
Calculate industrial chiller cooling duty (Tons of Refrigeration & kW) from chilled water flow rate and temperature difference (ΞT).
WORKFLOW INSTRUCTION:Confirm the published assumptions, enter the project data, and record the result and operating limits for Industrial Chilled Water Cooling Capacity (HVAC).
3
Cooling Tower Makeup & Blowdown
Scope-limited calculation
Calculate evaporation loss, blowdown rate, and total makeup water requirement for industrial cooling towers based on cycles of concentration.
WORKFLOW INSTRUCTION:Confirm the published assumptions, enter the project data, and record the result and operating limits for Cooling Tower Makeup & Blowdown.