Industrial Electrical Load & Transformer Sizing
Move from measured three-phase load and motor current to a planning-level transformer capacity and annual electricity-cost baseline for plant utility planning.
What this workflow covers
Move from measured three-phase load and motor current to a planning-level transformer capacity and annual electricity-cost baseline for plant utility planning.
This 4-step checklist is intended for electrical engineer. Confirm each linked calculator's units, formula, assumptions and operating limits before using the result in a project decision.
Three-Phase Electrical Power
Calculate real power (kW), apparent power (kVA), reactive power (kVAR), and full-load line current for 3-phase AC systems.
Motor Current Estimation
Calculate full-load line current (FLA) for 3-phase induction electric motors based on power rating and voltage.
Transformer kVA Rating & Load Sizing (IEC 60076)
Calculate minimum required transformer kVA capacity rating and secondary full-load current based on active load (kW) and power factor.
Plant Energy Consumption & Cost
Calculate daily, monthly, and annual electric energy consumption (kWh/MWh) and total electricity operating cost.