Industrial Energy & Carbon Audit
Build a plant electricity baseline, estimate annual cost and Scope 2 emissions, then screen PV and battery capacity for a measured industrial load profile.
What this workflow covers
Build a plant electricity baseline, estimate annual cost and Scope 2 emissions, then screen PV and battery capacity for a measured industrial load profile.
This 4-step checklist is intended for energy auditor. Confirm each linked calculator's units, formula, assumptions and operating limits before using the result in a project decision.
Three-Phase Electrical Power
Calculate real power (kW), apparent power (kVA), reactive power (kVAR), and full-load line current for 3-phase AC systems.
Plant Energy Consumption & Cost
Calculate daily, monthly, and annual electric energy consumption (kWh/MWh) and total electricity operating cost.
Industrial CO2 Carbon Emissions
Calculate Scope 2 greenhouse gas emissions from electricity consumption based on grid grid carbon intensity factor.
Solar PV Array & Battery Storage (BESS) Sizing
Calculate solar PV array capacity (kWp) and lithium battery bank size (kWh/Ah) for commercial & industrial microgrids.