SPECIFICATION SHEET • SI METRIC
CAT: HVAC

Factory Air Exchange & Ventilation

Calculate required ventilation airflow (CFM or m³/hr) based on building volume and required Air Changes per Hour (ACH).

OPERATING LIMITS — Air-change arithmetic only, not contaminant, heat, capture or hazardous-area ventilation design.
INPUT DESIGN PARAMETERS (SI)
m
m
m
changes/hr
CALCULATED SPECIFICATION OUTPUT
Required Airflow
90000 m³/h
Internal Volume15000 m³

Related planning checklists

This calculator appears in the following engineering planning checklists:

1. Factory Air Exchange & Ventilation2. Industrial Chilled Water Cooling Capacity (HVAC)3. Cooling Tower Makeup & Blowdown
1. Factory Air Exchange & Ventilation2. Duct Diameter from Airflow & Velocity3. Fan Power from Airflow & Static Pressure4. Airflow Sensible Cooling Load

Technical Methodology & Engineering Principles

GOVERNING EQUATION
Room volume = length × width × height; airflow = room volume × air changes per hour, divided by 60 for CFM in US units.
Assumptions & Scope

Well-mixed dilution ventilation at a user-selected ACH. Contaminant generation, capture velocity, make-up air, pressure balance, heat load, duct resistance, and code-required exhaust are excluded.

Operating Range & Boundary

Dimensions and ACH must be positive.